Qatar Transmission System Expansion – Education City Substations
   
PROJECT BRIEF

Kahramaa (Qatar General Electricity & Water Corporation) intends to develop and expand the existing power transmission network to meet with the increased power demand due to the developmental works in the State of Qatar.

 

The project scope is for the Establishment of Phase-VIII Transmission Network expansion within Education City. The project consists of Design, Supply and Construction of 5 substations (GIS and Transformer Feeder Substation) within Education City Developments.

 

EDC-02 & 06 are typical 66 KV GIS Substations and EDC-03 & 05 are typical 11 KV Transformer Feeder Substation.

 

EDC-04 substation is totally an unique design type of two substation types (GIS and Transformer feeder) operating independently within a single structure

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CLIENT NAME
LARSEN & TOUBRO LIMITED (ECC DIVISION)
SCOPE OF WORK
Design & Development
Concept Design, thru to construction drawings for Architecture and all Engineering disciplines
 
 
Site Location
Project Period
2008   2009
Project Status
Ongoing